Progress Reports
- Assembled the lower frame
- Isolated the gearboxes and began initial assembly of them
- Inventoried the kit parts
- Diagram schematics reviewed
Next time:
January 10-
-
Construct the bumpers
- Continue the construction of the frame
- Continue to make up designs to score with the low-trackball option
January 12-
-
Dissembled the bumpers
- Opened gearboxes for greasing
- Assembled parts list
- Discussed transmission gear/torque ratios
Next time:
-
Acquire parts
- Grease gearboxes
- Assemble flat top
- Assemble bumpers
-
Greased transmission
- Ordered parts
-
Assemble bumpers
- Start flat top
January 19-
- Fixed the transmissions
- Assembled the advanced frame
- Discussed the advanced transmissions
- Helped structures with the pneumatics
Next time:
-
Finish bumpers
- Cut gear box bearing/motor holes
-
Finish friction wheels
- Assemble back plate
- Assembly transmission
January 26-
-
Finished transmission
- Finished frame
- Worked on bumper assembly
January 28:
Next time:
-
Work on bumpers
- Continue to develop herding idea
January 31
- Worked on bumpers
- Changed the back plates
- Adjusted chains
- Replaced tread on a friction wheel
|